“Richard and the crew from Pinecone Agency were incredibly accommodating in our very particular needsIncredibly accommodating”
Tim Zafir

From no website to tender-ready in under two weeks

Case study

Eviron Vegetation Management

Eviron Group brings more than 30 years of combined experience in vegetation control and arboriculture to government bodies and utilities along Australia’s east coast. It had no website, and in a sector where buyers research suppliers before shortlisting them, that was costing contracts.

  • The EVM homepage shown on a desktop browser and a phone, headed "Vegetation management you can rely on" in white on a dark photograph, with Contact us and Emergency tree services actions beneath.
  • The "Built for Australia’s critical infrastructure" section, with four photographic cards covering safety, national reach, transparent reporting, and equipment.
  • The service-area section, headed "Vegetation management across Sydney and Australia-wide", with a map of Australia beside an expandable list of regions covered.
Client
Eviron Vegetation Management
Industry
Vegetation management
Location
Sleepy Hollow, New South Wales
Services
Platform

The challenge

Eviron Group manages vegetation for utilities, councils and contractors, with a safety record and a reputation built over three decades. Its work runs from tree climbing and crane removals to asset inspection and environmental management.

None of that was visible online, because there was no website.

Commercial clients and government bodies increasingly research a supplier before engaging one, and a tender process is exactly where an absent digital presence is read as a risk. Competing for large contracts without a site put the business at a straightforward disadvantage against less experienced competitors who had one.

There was a second constraint. This is an operational business with crews in the field, so the work could not wait on a long build, and it could not consume the team's attention while it happened.

Our approach

  1. Strategy

    Because credibility was the blocker, the sequence mattered more than the scope. We split the build in two.

    • Stage one: a polished homepage, live fast, so there is something to point a prospect at
    • Stage two: the full marketing site, built out behind it
    • A foundation that can carry case studies, industry pages and content later without a rebuild
  2. Design

    Custom Figma designs, mobile-first, for an audience that is often reading on site rather than at a desk.

    • Designed for the small screen first, then widened to desktop
    • Service information structured to explain complex capabilities to a non-specialist buyer
    • The safety record and 30 years of experience given real space, since they are the differentiators
  3. Development

    Built in Webflow, with the lead capture and measurement in place from launch rather than added later.

    • Contact and careers forms with spam protection and automated routing
    • On-page SEO, meta data and internal linking built in from the start
    • GA4 with custom event tracking, so form conversions are visible from day one

Technical deep-dive

  • A two-stage build

    The phasing was the strategy, not a compromise on it.

    • Homepage live within 1.5 weeks, giving the team something to use in tenders immediately
    • Full marketing site delivered within 2 to 4 weeks
    • Structured so later expansion does not mean starting again
  • Forms that route themselves

    Two distinct audiences arrive: clients with work, and people looking for a job.

    • Separate contact and careers forms with automated routing
    • Spam protection and success confirmation on both
  • Measurement from launch

    A first website is also the first time the business can see demand.

    • GA4 with custom event tracking installed at launch, not retrofitted
    • Form conversions tracked, so enquiry sources are visible
  • Handover as a deliverable

    A field business cannot depend on an agency for a copy change.

    • Webflow Editor access with a recorded walkthrough
    • Cross-browser and device testing before handover

Results and impact

The timings below are the project record. No traffic or lead figures are published here, because this was a first website and there is no before to measure against.

  • 1.5 weeks

    Homepage live

    • Stage one of a deliberate two-stage build
  • 2 to 4 weeks

    Full site delivered

    • Built out behind the already-live homepage

A business with 30 years of experience now looks like it. Prospects researching a supplier find the services, the safety focus and the track record, and can enquire in a couple of taps from a phone on site.

Because the analytics went in at launch, the team can also see which services draw enquiries, which is information the business has never had before.

Key takeaway

For a business with no website, the first job is not the perfect site. It is being findable and credible before the next tender closes. Splitting the build meant Eviron had something real to point at in a week and a half, and the full site followed without the pressure of being the only thing standing between them and a contract.

Let’s build something that works for your business

High-performing websites, AI-powered software and automations, built to scale and evolve with your business.

Book a discovery call

30-minute call.